Discuss Your Project

Projects

Work That Keeps the World Moving.

277+ project sites since 2006 — hospitals, universities, offices, housing, industry, highways, ports, rail and public transport.

Saudi German Hospital — Traffic Impact Assessment

Healthcare · Lahore

Saudi German Hospital — Traffic Impact Assessment

Traffic and transportation assessment for a 63.57-kanal hospital, with PTV Vissim simulation and SIDRA analysis, modelled 20 years ahead.

Truck Terminal, King Abdulaziz Port — Design, Planning & Vissim

Port Logistics · Dammam, KSA

Truck Terminal, King Abdulaziz Port — Design, Planning & Vissim

Terminal layout design and planning, PTV Vissim modelling of truck access, internal circulation and gate queuing, and swept-path analysis for articulated and tandem-trailer trucks.

Trenton–Mercer Airport (TTN) — Capacity Analysis

Aviation · New Jersey, USA

Trenton–Mercer Airport (TTN) — Capacity Analysis

Minimum, intermediate and full air traffic capacity for the proposed master plan layout: runway capacity by aircraft mix and weather, gate turnaround capacity and annual operations, compared with the 2035 forecast — prepared for the airport's board of advisors.

Lahore Fort Mobility Study — Walled City

Heritage & Urban Mobility

Lahore Fort Mobility Study — Walled City

Traffic, parking and pedestrian mobility analysis for Lahore Fort and its buffer zone, with traffic diversion, vehicle-free zones and dedicated pedestrian routes.

Passenger & Freight Demand Study — Pakistan Railways

Rail Planning

Passenger & Freight Demand Study — Pakistan Railways

Feasibility for the 85 km Chishtian–Chichawatni railway via Burewala, with passenger and freight demand, modal split and 25-year forecasts.

500 E-Bus Feasibility — Six Punjab Cities

Public Transport

500 E-Bus Feasibility — Six Punjab Cities

Province-wide framework for deploying 500 electric buses: route demand, fleet requirements, GIS route and depot planning, and charging infrastructure.

Elevated Expressway — Third-Party Evaluation & Traffic Study

Expressway · Lahore

Elevated Expressway — Third-Party Evaluation & Traffic Study

24-hour classified counts at 15-minute intervals across key junctions and a 1,000-sample willingness-to-pay survey for the Gulberg–Motorway M-2 corridor.

94 km Dual Carriageway — Traffic Surveys & AASHTO Pavement Design

Highways · Punjab

94 km Dual Carriageway — Traffic Surveys & AASHTO Pavement Design

MCC with video verification, AADT and ESAL analysis for the 94.3 km Gujrat–Sargodha Road rehabilitation.

P&D Building — Traffic Impact Assessment

Government · Lahore

P&D Building — Traffic Impact Assessment

32.54-kanal site with 214,903 sq ft covered area: 16-hour surveys at four intersections, SIDRA 9.1 analysis, 2030 forecasts and signal optimisation.

Cancer Care Hospital — Parking Assessment & Traffic Study

Healthcare · Lahore

Cancer Care Hospital — Parking Assessment & Traffic Study

332.8-kanal campus with 420,317 sq ft covered area: traffic generation, distribution, multi-access circulation and parking demand.

Indus Hospital — Traffic Impact Assessment

Healthcare · Lahore

Indus Hospital — Traffic Impact Assessment

68.8-kanal hospital: circulation and parking for 715 cars and 1,062 bikes, with ambulance access and pedestrian safety measures.

Sir Ganga Ram Hospital — Mobility & Parking Study

Healthcare · Lahore

Sir Ganga Ram Hospital — Mobility & Parking Study

Mobility and parking study for the proposed Mother & Child Block, covering access and circulation for patients, staff and visitors.

FAST-NUCES — Parking Assessment & Traffic Study

Education · Lahore

FAST-NUCES — Parking Assessment & Traffic Study

TEPA-compliant TIA for a 165,934 sq ft academic building: 16-hour MCC at four junctions, SIDRA LOS analysis and parking for 122 cars and 281 bikes.

28-Storey Bank Tower — TIA, Forecasting & SIDRA Analysis

Commercial High-Rise · Lahore

28-Storey Bank Tower — TIA, Forecasting & SIDRA Analysis

Traffic generation, network capacity and development impacts using SIDRA and ITE trip generation, with loading and service access planning.

12-Storey Office Building — Traffic Impact Assessment

Institutional · Lahore

12-Storey Office Building — Traffic Impact Assessment

19,600 sq ft plot with three basements and 88,196 sq ft covered area: traffic generation, parking demand, access and junction performance.

Residential Community — Traffic Assessment & Network Planning

Residential · DHA Lahore

Residential Community — Traffic Assessment & Network Planning

Mobility study, network planning and TIA for a 56-kanal residential site, supporting regulatory approval.

P&D Punjab · 31.2 km

Nowshera Virkan–Hafizabad Road — Traffic Study

48-hour classified counts on three sections, with road and pavement condition assessment.

NHA & P&D · Gujrat

Gujrat — 7-Day Traffic Survey

24/7 counts at city entry and exit points using manual, automatic and video methods for flyover planning.

Kingdom of Saudi Arabia

Urban Junction Microsimulation, Al Majma'ah

PTV Vissim modelling of city junctions along the Route 535 and Route 65 corridors: queues, delays, level of service and improvement options.

Pinal County, Arizona, USA

Magma Butte Ranches — Traffic Impact Study

TIS preparation and revision, access spacing, sight distance and county review responses.

Caribbean

Roundabout (Chowk) Design

Traffic roundabout design and capacity checks.

Sahiwal · Khushab · Karak · Kalam

Geophysical Investigations

ERS groundwater study, downhole seismic tests, thermal conductivity and MASW for industrial and hydropower sites.

Project Map

Where We Have Worked.

Worldwide

0Years
0Countries
0Regions
0+Project Sites
South AsiaMiddle EastNorth AmericaCaribbean

Pakistan

Let’s Build Something That Lasts.

Discuss Your Project