Discuss Your Project

Traffic Count Surveys

Traffic Count Survey for Petrol Pumps in Pakistan: Complete Guide

By AROM Editor · 23 November 2026

Why a petrol pump needs a traffic count survey

Before an oil marketing company (OMC) agrees to brand a new petrol pump, it wants proof that enough vehicles pass the site to make the station profitable. The most common way to provide that proof is a traffic count survey: a record of how many vehicles pass the site, of which types, in which direction, and at what times of day.

A good traffic count survey answers three questions every OMC and investor asks:

  • How much traffic passes the site each day and in the peak hours?
  • What is the vehicle mix: cars, motorcycles, rickshaws, vans, buses and trucks?
  • Which direction does the heavier flow travel, and can those vehicles easily enter the site?

What a manual classified count (MCC) includes

A manual classified count, usually called an MCC, is a survey in which trained enumerators stand at the site and record every vehicle by type. For fuel station projects, a standard MCC usually covers:

  • Duration: 12 hours (for example 7 am to 7 pm) or 24 hours, depending on the OMC’s requirement.
  • Vehicle classes: motorcycles, cars and jeeps, rickshaws, vans and pickups, wagons and buses, and light and heavy trucks.
  • Direction: separate counts for each direction of the frontage road.
  • Time intervals: counts in 15-minute or hourly intervals, so the peak hour can be identified.

What you receive

Our survey report is prepared in the format OMCs and approval authorities are used to seeing. It includes hourly and directional volume tables, the vehicle mix by class, the peak-hour volume, and daily totals. Our counts have been accepted in OMC feasibility submissions for petrol pump projects we have supported, and the same reporting approach sits behind more than 240 traffic impact assessments we have completed, so the format is familiar to reviewers.

Behind every report is our own automated Excel calculation system. Field sheets are entered once, and the system produces the summary tables, peak-hour analysis and vehicle-mix percentages automatically. This keeps errors low and lets us deliver the report quickly.

MCC or video count?

Most petrol pump sites only need a manual classified count. Where a client wants a permanent visual record, or the site is on a busy highway, we also offer video-based traffic counts. Our MCC vs video traffic count guide explains the difference in detail.

Where we work

We carry out traffic count surveys for petrol pumps across Punjab, including Lahore, Sheikhupura, Kasur, Gujranwala, Faisalabad, Sialkot, Okara, Sahiwal, Multan and Bahawalpur, and in other provinces on request, including Karachi, Islamabad, Rawalpindi, Peshawar and Quetta.

Our track record

AROM Associates has worked on more than 270 project sites, including over 240 traffic impact assessments, and every one of them was built on field traffic count data. Our teams have counted traffic for hospitals, schools, offices, housing schemes, shopping centres, industrial units and public sector road projects. That experience is why our count reports are clear, consistent and accepted by reviewers.

Why choose AROM Associates

  • Affordable, transparent pricing for single sites and multiple sites.
  • Trained enumerators and engineer-supervised fieldwork.
  • An automated calculation system that delivers fast, consistent reports.
  • Video counts available when required.
  • A Lahore-based team that also provides traffic impact assessments (TIA) if your project needs one later.

Frequently asked questions

How long does a traffic count survey for a petrol pump take? The fieldwork takes one day for a 12-hour or 24-hour count. The report is normally ready within a few working days after fieldwork.

Do OMCs accept a 12-hour count? Many OMCs accept a 12-hour daytime count for site feasibility. Some ask for 24 hours. We confirm the requirement with you before mobilising.

Can you survey more than one site? Yes. We regularly plan multiple sites together, which lowers the cost per site.

How do I get a quotation? Send us the Google Maps location of your site. We will reply with a quotation, usually within one working day.

Request a quotation: Call +92-42-32326567 or mobile 0321-7921816, or email info@aromassociates.com with your site location.

Need this for your project? Call +92-42-32326567 or +92-321-7921816, or send us your project details.

Let’s Build Something That Lasts.

Discuss Your Project