AROM Associates provides integrated engineering and consultancy solutions in transportation, environmental, geotechnical, construction, and legal domains, delivering sustainable and compliant infrastructure services worldwide.

Govt. Housing Society (GOR), DHA Lahore

AROM Associates served as a key sub-consultant in delivering specialized Traffic Impact Assessment (TIA) services for the New Government Officers Residence (GOR) Housing Society project located near DHA Phase IX, Lahore during 2024–2025. The assignment involved conducting detailed traffic counts, movement pattern analysis, and road capacity evaluations to assess the projected impact of the proposed residential development on the surrounding road network.

Our team prepared a comprehensive TIA report for submission to the Infrastructure Development Authority, Punjab (IDAP), ensuring that all regulatory requirements were addressed. The study carefully evaluated access points, trip generation rates, and peak-hour traffic conditions to support submission to TEPA Lahore. Through structured analysis and professional coordination, we ensured timely delivery of all required technical documentation to facilitate project approvals and compliance.There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable. If you are going to use a passage of Lorem Ipsum,

Supporting Large-Scale Government Infrastructure Development

The project emphasized regulatory alignment, traffic efficiency, and sustainable urban integration to ensure that the proposed housing society operates without negatively affecting existing traffic flow and infrastructure stability.There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable. If you are going to use a passage of Lorem Ipsum,

Project Goal

To assess and document the traffic impact of the proposed government housing development while ensuring full regulatory compliance.

Our final recommendations provided structured traffic management measures, optimized access planning, and long-term mobility strategies to support sustainable residential expansion. The successful completion of this project highlights AROM Associates’ capability in delivering high-level technical analysis for major government-led infrastructure initiatives.

Project Summery

AROM Associates conducted a Traffic Impact Assessment for the Government Officers Residence (GOR) Housing Society near DHA Phase IX, Lahore. The study evaluated trip generation, peak-hour traffic, and road network capacity.

The TIA report supported regulatory submission to TEPA Lahore, ensuring sustainable integration of the housing society within existing urban infrastructure.