Deployment of 500 Electric Buses in Punjab
AROM Associates, as a consultant to Daewoo Service Company Ltd., conducted a comprehensive feasibility study during 2024–2025 for the deployment of 500 electric buses across Punjab’s major cities including Lahore, Rawalpindi, and Gujranwala. The assignment required a detailed evaluation of technical, operational, and environmental viability to determine the practicality of transitioning toward electric public transport at a provincial scale. Our team assessed existing public transport systems, passenger demand trends, and route performance to identify priority corridors for electric fleet integration.There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable. If you are going to use a passage of Lorem Ipsum, you need to be sure there isn’t anything embarrassing hidden in the Xbuild the best company in the world class middle of text.
The study further examined infrastructure readiness, including charging station requirements, depot planning, grid capacity considerations, and maintenance facility development. Through structured data analysis and forecasting models, we developed a strategic roadmap to support phased implementation while ensuring operational efficiency and sustainability. The project was successfully completed, establishing a technical foundation for large-scale electric mobility adoption in Punjab.
Driving Sustainable Urban Mobility Transformation
The initiative focused on modernizing public transport systems while reducing carbon emissions and improving urban air quality. Our analysis provided a balanced framework combining economic feasibility, infrastructure planning, and environmental responsibility.
Project Goal
To evaluate the viability of deploying 500 electric buses while ensuring sustainable integration within existing transport networks.
- Technical & Operational Feasibility Analysis
- Infrastructure & Charging Network Assessment
- Environmental & Sustainability Evaluation
Our final recommendations delivered a structured implementation strategy outlining fleet deployment planning, infrastructure upgrades, and long-term operational sustainability. The study supports Punjab’s transition toward cleaner, smarter, and more efficient public transport systems while reinforcing AROM Associates’ expertise in strategic mobility planning.There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form, by injected humour, or randomised words which don’t look even slightly believable.
Project Summery
AROM Associates completed a province-wide feasibility study for deploying 500 electric buses across major cities of Punjab including Lahore, Rawalpindi, and Gujranwala. The study assessed operational, environmental, and infrastructure requirements.
The project supports sustainable urban mobility, charging infrastructure development, and modernization of Punjab’s public transport system.
